The UK Open Pool Championship is one of the leading events on the professional pool calendar. Delivered for Matchroom at The Brentwood Centre, our role was to design and deliver the venue infrastructure required to transform the venue into a professional competition environment, supporting players, spectators, media and broadcast operations throughout the event.
Our scope of work included a complete infrastructure package across the competition and practice areas, combining structural, technical and presentation elements to support the demands of a major international tournament. This included TFS sets for Tables 1 to 4, table trusses, trussing for two practice tables, Steeldeck seating banks, pipe and drape installations, a carpeted feature area for Table 1, a media backdrop, and full AV and power distribution. Together, these elements created a professional environment that supported both the live event experience and broadcast production throughout the championship.
Need help with your next event? Contact us below!
