PRG came to us the week before the ICC Women’s T20 World Cup final at Lord’s needing a set of movable performance platforms for the pre-show, half-time and closing shows. The platforms had to go up and come down quickly around live play, sit on the outfield without damaging the surface, and carry sponsor branding that would read on camera. We took the brief on and delivered it inside the week.

 

Project Highlights

Client: PRG

Event: ICC Women’s T20 World Cup Final 2026, England v Australia

Location: Lord’s Cricket Ground, London

Services Delivered: Design and adaptation of movable performance platforms, pneumatic wheel systems to protect the outfield, on-site build and removal, sponsor branding

 

The Challenge

The request came from Marek at PRG. He sent through a tender for a range of performance platforms that needed to be built and taken down quickly during the final, and there was about a week between that first approach and delivery on site. We didn’t spend time asking why the notice was so short, we could see what the job needed and knew we could deliver it, so we said yes.

There were two things we had to consider from the start of planning. The platforms needed to come on and off the ground fast enough to fit around live play and the broadcast schedule, and they had to do it without marking the outfield. Lord’s sets a strict weight limit on the ground itself, so anything we brought onto the pitch had to spread its load rather than concentrate it in one place. The platforms also needed to carry sponsor branding clearly enough to hold up on camera, so the commercial side of the show worked as well as the physical build.

 

Our Approach

Rather than build something new from scratch against the clock, we adapted stock we already hold to reach the configuration PRG were after. That kept us well inside the lead time without cutting any corners on the finished result. We keep pneumatic wheels in stock for both aluminium and steel decks for exactly this kind of job, and those wheels were what let us roll the staging on and off the Lord’s outfield without damaging the surface.

The main stage was 28ft wide by 16ft deep, with a central catwalk running out from it, giving the performers a clear focal point in front of the cameras. Alongside it we built a second set of platforms at heights between 400mm and 800mm, in sizes from 4ft square up to 8ft square, so the production had the range of levels it needed across the different parts of each show. Every platform was moved into position by hand.

The one thing we had to solve on the day was the weight allowed on the ground. We worked within it by adjusting the platform heights to keep the load inside the limit while still giving PRG the look they had asked for. Ahead of the event the main preparation was wear-checking the wheel configurations to be sure they were safe to run on the surface, which was the right thing to focus on given the time we had.

 

Working with PRG on Site

Getting crew and transport in place at short notice was straightforward for us. We have full-time crew rather than relying on freelance cover, and we have our own fleet of vehicles, so mobilising quickly is something we can do without a lot of moving parts to line up first. That is a large part of why a week’s notice was workable in the first place.

On site our crew worked alongside the PRG crew to get each platform into position. The audio, lighting and power were already installed, so everything was ready to connect the moment a platform reached its final spot. That kept the changeovers moving at the pace the schedule needed.

 

On the Day

Two main moves were needed across the day. The first was taking the pre-show platform off the ground so that play could start on time. The second was building the closing show stage once play had finished, then taking it down again straight afterwards. Both had to happen at pace to keep the broadcast and the live show on schedule.

Four of our crew were on site across five days, from the build through to the de-rig on the Monday. Working in front of a full house at Lord’s, with the acts waiting to go on, there is no room to get it wrong. The platforms went in and came out cleanly at every changeover, and the pre-show, half-time and closing segments all ran as planned.

 

The Outcome

Everything came together the way we planned it. Both the pre-show and closing show platforms did exactly what they were built to do, the shows ran to time, and the build stayed inside Lord’s weight restrictions from start to finish. It is the kind of short-notice, high-pressure job we are set up to take on, and having our own crew, transport and stock is what lets us take it in our stride rather than turn it away.

 

Client Feedback

“I’d also like to take this opportunity to say a huge thank you to you and your team for pulling this job together at such short notice. I know there were many challenges along the way, but the end client was extremely pleased with the outcome and is already discussing future opportunities with us.

I’d also like to personally thank Mark and the on-site team for their professionalism and flexibility in dealing with all the changes that were thrown their way. We simply couldn’t have delivered the project without their support and dedication.”

  • Marek Kowalewski, Director of Sport at PRG

 

Looking Ahead

A job like this shows what we’re built for. Because our crew, transport and equipment are all in-house, we can commit to short lead times and demanding builds with confidence and deliver them to the standard live broadcasts demand.

Need help with your next event? Contact us below!

Contact us

“We have worked with Trans-Sport.tv for a number of years now and always find them to be helpful, responsive and to try and solve problems. The team are really easy to work with and provide solutions when needed. We wouldn’t hesitate to recommend them to others.”

Andy Holmes, Senior Production Manager - Sky Sports

“Shaun and his Team at Trans-Sport have been contractors to Matchroom on event broadcast for over 20 years. Driven by a desire to get the very best out of every event in the most safe, yet cost effective manner Trans-Sport exceed all expectations. Their total commitment and infrastructure delivery allows Matchroom to produce top quality productions, and that’s what keeps us all at the top of the game!”

Barry Hearn, Chairman - Matchroom Sport

“I have contracted Shaun and his team on every genre of event, from Royal Weddings, Funerals and State occasions to large scale entertainment events such as the BRITS and BAFTA’s. Trans-Sport deliver detailed diagrams and plans complete with calculations on time, every time and exemplify a passion for safe working practice. Their crew are always equipped with the correct PPE and their plant licences are always up to date. The depth of knowledge and ability to effectively lead a large cohort of multi-skilled contractors, from the front, through an environment of constant change, has established Trans-Sport as our first call company, regardless of scale or complexity of operation.”

William (Bill) Morris, International Business Director - CTV Outside Broadcasts

“The Professional Darts Corporation has enjoyed a long and productive relationship with Trans-Sport.tv. As our events and demands have grown over the years, so has Trans-Sport.tv’s ability to provide us with first class staging and production assistance and equipment and they form a vital part of our event team alongside our own staging company and host broadcasters. Trans-Sport.tv’s flexible and accommodating approach, always with a willingness to help and get the job done to a high standard, make them a crucial partner of ours all year round. ”

Matthew Porter, Chief Executive - PDC

“Over the years I have worked with Trans-Sport.tv they have always gone the extra mile for every job. They work exceptionally hard to meet our requirements, working in all types of environments and to different schedules. All the crew are highly experienced and always work to best practices. They can always be relied upon. I would highly recommend them.”

Jenna Winstanley, BBC Events

“IMG Productions has worked with Trans-Sport.tv on its Snooker and Darts coverage for many years. Shaun Cope and his team provide an exceptional service for all our scaffolding and rigging requirements and they always go out of their way to achieve the best possible job at all times. In a time when we’re all under pressure with production budgets, we are very appreciative of Shaun and his willingness to look at the whole project and come up with the most cost-effective solution. I would have no hesitation in recommending Trans-Sport.tv to other production companies and broadcasters.”

Alison Witkover, Executive Producer - IMG Productions

“We have worked with Tran-Sport for ten years and always found them to be the most professional outfit whatever the circumstance and time of day. Their dedication and hard work is matched by their flair and enthusiasm.”

John Leach, Managing Director - Sunset+Vine

“World Snooker have worked for many years with Trans-Sport on over 100 different televised snooker tournaments worldwide. On every event Shaun and the Team at Trans-Sport demonstrate utmost professionalism. In particular their safe working practices, methods of rigging, competence of planning events and bringing contractors together along with the overall strategic and efficient working practices are rated high in our estimations and would have no hesitation recommending their services to others.”

Nigel Oldfield, Operations Director - World Snooker

“Tuxford Academy’s Creative Arts Faculty has had the privilege to work in partnership with Trans-sport for the last six years. Over that period they have given their time & expertise most generously. Their support has been focused on assisting us with our annual school production & talent shows, through provision & installation of staging, lighting rigs & sound equipment. Despite their own highly demanding schedule, they always find time for us. I am inspired not only by their professionalism, but also their commitment to organisations like ours. Countless young people in the Tuxford area have enjoyed participation in productions which we could not have staged so ambitiously were it not for such a dedicated team.”

Jeff Evason, Subject Leader, Music – Tuxford Academy

You may also like

For more information or to make an enquiry please contact us
Phone icon01777 248 258Email iconinfo@trans-sport.tv