Client: Burghley House and Ye-Ha Productions
Location: Burghley House, Stamford
Date: Thursday 3rd to Sunday 6th September 2026
Our role: Supply and installation of camera towers, a camera platform, marshals’ platforms, access staircases and LED screen framework
Our team installed six camera towers and a range of supporting structures for the Burghley Horse Trials 2026, held in the grounds of Burghley House. We also supplied the platforms, staircases and screen framework that supported both the production and the running of the event.
The build brought the full range of British weather, with sunshine in the morning turning to torrential rain by the afternoon. Working outdoors means taking that as it comes. The ground softens, visibility drops and every part of the build takes longer, but the production schedule does not move to accommodate any of it. Across the site, the crew installed six camera towers, a 1.8m x 1.8m camera platform, four 1.2m square marshals’ platforms, four sets of access staircases and the framework for the LED screen. They worked through the conditions carefully and without fuss, so the production team had every position in place and ready when they needed it.
Need help with your next event? Contact us below!